Should the project require Factory Mutual insurance underwriting, the Specifying Professional for the project should consult with the FM Regional Engineer to determine any provisions they may require be met as part of the design of the structural system. The Specifying Professional remains responsible for the interpretation of these requirements on the job. The following guidelines outline Vulcraft's understanding of two possible approaches that may be taken concerning additional roof deck design requirements FM may require: