This building consists of a two-story office structure attached to an industrial shop in Fort Saint John. The second floor of the office structure was supplied as an Ecospan project converted from a Hambro system & erected by the general contractor.
Steel Fabricator: M3 Steel Structures Ltd.
Architect: Kumlin Sullivan, Architecture Studio Ltd.
General Contractor: Industrial Shop & Office
Products Used: Ecospan