Continental Pipelines

Location: Fort Saint John, BC


This building consists of a two-story office structure attached to an industrial shop in Fort Saint John. The second floor of the office structure was supplied as an Ecospan project converted from a Hambro system & erected by the general contractor.​

Project Specifics


Steel Fabricator: M3 Steel Structures Ltd.

Architect: Kumlin Sullivan, Architecture Studio Ltd.

General Contractor: Industrial Shop & Office

Products Used: Ecospan

Vulcraft Products Used: