Rather than renovate on old and out-dated facility, Worcester Regional Transit Authority decided to build a completely new and modern stucture. The new building utilized a single 48,000 lb, 17-feet high and 80-feet long truss manufactured by United Steel.
Project Completed: 2017
Steel Fabricator: United Steel
Architect/Designer: STV, Inc.
General Contractor: Skanska USA Building Inc.